Skip to main content

Davis-Bacon wages and certified payroll explained

What triggers Davis-Bacon prevailing wages on federally funded construction, how to find wage determinations on SAM.gov, and how weekly certified payroll works.

By AV Construction Group Corp. Published 7 min read

Illustration for articles about government contracting

The Davis-Bacon and Related Acts require contractors and subcontractors to pay laborers and mechanics at least the locally prevailing wage and fringe benefits on covered federal and federally assisted construction contracts over $2,000. The wage rates come from a wage determination, which is published on SAM.gov and must be in the contract. Covered employers submit certified payrolls every week of covered work. DOL lists Florida as having no state prevailing wage law, but the federal rules apply to covered projects in Florida.

What triggers Davis-Bacon

According to the U.S. Department of Labor (DOL), the requirements apply to contracts over $2,000 for the construction, alteration or repair of public buildings or public works, including painting and decorating. Two groups are covered:

  • Federal contracts. Contracts the federal government or the District of Columbia enters directly.
  • Related Acts. Federal programs that assist construction through grants, loans, loan guarantees or insurance and that include the prevailing wage requirement by law.

The rules cover laborers and mechanics working on the site of the work. DOL says bona fide executive, administrative or professional employees are not covered, and a foreman who spends more than 20% of the workweek on manual work is covered for that time. For prime contracts over $100,000, the Contract Work Hours and Safety Standards Act separately requires overtime at one and a half times pay for hours over 40 in a workweek.

Which clauses apply depends on the contract, so the solicitation and contract clauses are the controlling documents. If a project uses grant or loan money, ask the funding agency or the owner whether the Related Acts apply.

Wage determinations on SAM.gov

A wage determination (WD) lists job classifications, the basic hourly rate and the fringe benefit rate for a location and type of construction. DOL says SAM.gov has been the official source for general wage determinations since June 14, 2019.

  • General wage determinations cover most counties by construction type: building, residential, highway and heavy. DOL issues a new annual edition in the first quarter, and rate changes are posted as modifications, generally on Fridays.
  • Project wage determinations are issued for a single project when no general WD fits. The agency requests them with Form SF-308, and they are valid for 180 days.

To look one up, open the Wage Determinations tab on SAM.gov, enter the WD number, or select "Public Building or Works" and filter by state, county and construction type. The contracting agency is responsible for putting the correct WD into the bid documents so you can estimate wages. Contractors must also post the wage determination and the DOL poster (WH-1321) at the work site.

For sealed bids, revisions issued at least 10 days before bid opening apply, according to DOL. After award, modifications generally do not change a contract's rates, with exceptions such as added substantial work or exercised options.

Paying the determination correctly

The WD rates are minimums for each classification.

  • Fringe benefits. Only bona fide benefits such as health insurance, pensions and paid leave can count toward the fringe rate. Payments required by law, such as Social Security, unemployment insurance and workers' compensation, do not count. A worker can be paid fringes as cash instead where the rules allow, and the payroll form records it.
  • Classification. Pay follows the work actually performed. If the WD lacks a classification you need, DOL's process is a conformance request submitted through the contracting agency.
  • Apprentices. Apprentices can be paid less only if they are registered in an approved program (or in their first 90 probationary days) and the site follows the allowed ratio. Otherwise, the full rate applies for the work performed.

Weekly certified payroll

Certified payroll is a weekly payroll report, signed under a compliance statement. Under 29 CFR 5.5(a)(3), contractors and subcontractors must:

  1. Keep regular payroll records for every covered worker while the work is underway and for three years after the prime contract's work is complete. Records include name, classification, hourly pay and fringes, daily and weekly hours, deductions and wages paid.
  2. Submit a certified payroll for each week in which covered work is performed. The prime contractor collects and submits the payrolls of its subcontractors.
  3. Include a signed Statement of Compliance saying the payroll is accurate and complete, that workers were paid the required rates, and that no improper deductions were taken.
  4. Make records available for inspection and let workers be interviewed on the job during working hours.

Form WH-347 is DOL's optional weekly certified payroll form. A properly completed form satisfies the requirement, but you may use another form with the same required content and the same Statement of Compliance wording. DOL notes that false certification can lead to civil or criminal liability, and that failure to provide records can lead to withheld payments or debarment. Weekly submissions may omit full Social Security numbers, using an identifier such as the last four digits. Electronic systems are allowed if they use legally valid e-signatures and keep records accessible for three years.

DOL's page also notes that a 2023 rule updating the regulations is partly blocked: a June 2024 nationwide preliminary injunction covers three provisions, including ones on material suppliers, delivery truck drivers and omitted contract clauses. Check DOL for the current status.

Florida: prevailing wage and local wage rules

DOL lists Florida among the states without a state prevailing wage law, noting its law was repealed in 1979, in a table updated January 1, 2023. Federal Davis-Bacon requirements still attach to covered federal and federally assisted contracts through the contract clauses.

Local rules have also changed. Section 218.077 of the Florida Statutes, as amended by chapter 2024-80 (HB 433), now bars local governments from using their purchasing and contracting processes to control the wages or benefits of vendors and contractors, or from giving bid preferences for them. The staff analysis says this applied starting September 30, 2026, and contracts signed before that date are not impaired. The statute also says it does not apply to the extent compliance would cost the local government federal funds or conflict with federal requirements for those funds. How that interacts with a particular project is a question for the project owner or counsel.

For a contractor, wage terms in a public Florida contract may therefore come from Davis-Bacon if there is federal money, from the owner's specifications, or from state and federal wage laws. Read the contract's wage clauses closely.

Questions people ask

Does Davis-Bacon apply to a small repair job?

It applies to covered contracts over $2,000 for construction, alteration or repair, including painting and decorating. Whether a particular job is covered depends on the contract and funding.

Who is responsible for subcontractors' payrolls?

The prime contractor is responsible for collecting and submitting subcontractor payrolls and for the subcontractors' compliance with the clauses.

Is certified payroll the same as normal payroll?

No. It is a weekly report tied to the wage determination's classifications and rates, with a signed statement. Your normal payroll system supplies the data, but the report format is specific.

Check before you decide

  • Find the wage determination number in the solicitation and read the WD on SAM.gov.
  • Match each worker to a classification and rate before pricing the job.
  • Set up weekly payroll collection from every subcontractor and decide who signs.
  • Keep records for at least three years after the prime contract's work is complete.
  • Confirm current DOL guidance and consult a labor attorney for questions on coverage. See also /government and SAM.gov registration.

Sources

  1. U.S. DOL: Davis-Bacon and Related Acts
  2. U.S. DOL: Davis-Bacon and Related Acts frequently asked questions
  3. U.S. DOL: Davis-Bacon wage determinations
  4. eCFR: 29 CFR 5.5, Contract provisions and related matters
  5. U.S. DOL: Form WH-347, Weekly Certified Payroll
  6. U.S. DOL: State prevailing wage laws
  7. Florida Statutes, s. 218.077 (2026)
  8. Florida House staff analysis of HB 433 (2024)

Planning a project?

Tell AV Construction Group Corp. about your project and we will follow up.

Keep reading

More guides on the blog