Wind mitigation inspections: roof features that matter

What a Florida wind mitigation inspection checks on the roof: covering, deck attachment, roof-to-wall, shape and secondary water resistance.

By AV Construction Group Corp. Published 6 min read

Illustration for articles about roofing

A Florida wind mitigation inspection documents how well a home is built to resist hurricane winds, using the state's Uniform Mitigation Verification Inspection Form, OIR-B1-1802. On the roof, the inspector records the roof covering, how the roof deck is nailed, how the roof is connected to the walls, the roof shape, and whether the roof deck has secondary water resistance. Insurers may use the results when rating a policy, but whether and how much they credit each feature is up to the insurer, and nothing is guaranteed.

The form was revised: inspections on or after April 1, 2026 must use OIR-B1-1802 (Rev. 04/26). Citizens Property Insurance has said it will still accept the older Rev. 01/12 form if it was completed within five years before that date and the structure is unchanged. Other insurers may differ, so check with yours.

What the form is, and who completes it

The form is adopted by the Florida Office of Insurance Regulation (OIR) under Rule 69O-170.0155. It must be completed by a qualified inspector, which the form lists as licensed home inspectors, building code inspectors, licensed contractors, professional engineers, architects, or others the insurer recognizes. Except for contractors and engineers, the inspector has to personally inspect. The homeowner also signs to confirm the inspection took place. The form asks for at least one photo or document supporting each attribute marked in questions 2 through 9, and it is valid for up to five years if the structure has no material changes and no inaccuracies are found.

The nine questions

The Rev. 04/26 form has nine questions. These are the ones tied to the roof and to the rest of the structure:

  1. Building code. The code in force when the home's permit was applied for, such as the 2001 and 2004 editions, 2007 or later, or, for the high-velocity zone only, the 1994 South Florida Building Code.
  2. Region. Set by design wind speed: HVHZ, or Region 1, 2 or 3.
  3. Roof slope. 6:12 or greater, or less than 6:12, for the slope covering at least two-thirds of the main roof.
  4. Roof covering. Compliance with the code through a product approval, permit date or construction date.
  5. Roof deck attachment. The weakest nailing found.
  6. Roof-to-wall attachment. The weakest connection found.
  7. Roof geometry. Hip, flat (for certain buildings), or other.
  8. Sealed roof deck or secondary water resistance.
  9. Opening protection. Windows, doors, garage doors and skylights.

Roof covering

For each covering on the property, the inspector notes the type (shingle, tile, metal, built-up, membrane or other) and records evidence: a permit date, a product approval number, or the installation year. The form then sorts the covering by compliance. In broad terms, a covering qualifies when it has an FBC or Miami-Dade product approval current at installation, or when the permit application was filed on or after March 1, 2002, or the original roof was built in 2004 or later. A separate category covers coverings with a Miami-Dade product approval, with extra date options for older high-velocity-zone homes. Keep your permit, NOA and final inspection paperwork: it is the evidence.

Roof deck attachment

The form asks for the weakest attachment. The categories depend on the sheathing and fastening:

  • Lowest level: 7/16-inch plywood or OSB nailed with staples or 6d nails at 6 inches on the edges and 12 inches in the field, or equivalent
  • Middle level: 8d nails at no more than 12 inches in the field, or at least 103 psf mean ultimate uplift resistance
  • Highest wood level: 8d nails at no more than 6 inches in the field, or at least 182 psf, or comparable lumber decking with two nails per board
  • Other categories cover reinforced concrete, spray foam and unknown or inaccessible decks

Florida's roof-replacement rule affects this item. Section 553.844 requires roof replacements on site-built single-family homes to include strengthened roof-deck attachment, which is one reason deck re-nailing appears in replacement bids.

Roof-to-wall attachment

This is about the metal connectors or fasteners between rafters or trusses and the wall. The form asks for the weakest connection: toenails, clips, single wraps, double wraps, structural connections, other, unknown, no attic access, or connections not installed as intended. It sets documented uplift capacity thresholds for the main categories: 185 lbs for toenails, 386 for clips, 535 for single wraps and 891 for double wraps.

The 04/26 revision lets retrofit connectors qualify based on tested, documented allowable uplift capacity when installed per the manufacturer, rather than only on how they look. Severely corroded connectors can fail the conditions for the clip and wrap categories. Because a retrofit may not be visible in a future inspection, keep installation records.

In Miami-Dade, a roof replacement on certain homes triggers roof-to-wall work. The statute applies the requirement to buildings in the wind-borne debris region with an insured or assessed value of $300,000 or more, and the county publishes a compliance affidavit signed by the qualifying agent when a prescriptive retrofit is installed.

Roof shape

The form recognizes a hip roof (with other shapes no more than 10 percent of the perimeter), a qualifying flat roof on a building of five or more units, and other. Shape is a design feature; it cannot be changed with a small repair.

Sealed roof deck (secondary water resistance)

This asks whether the roof would keep water out if the covering were lost. Standard underlayment and hot-mopped felt alone do not count. Qualifying methods listed on the form include:

  • Fully adhered polymer-modified bitumen underlayment (ASTM D1970)
  • Taped deck seams with an approved strip or flashing tape
  • Two layers of felt or synthetic underlayment without tape, meeting the listed standards
  • Spray foam applied at the rafter and deck joints

The inspector marks whether the whole underside is covered.

The FORTIFIED connection

The revised form accepts a FORTIFIED Home certificate (Roof, Silver or Gold) as validation for several questions, including roof covering, roof deck, roof-to-wall and sealed roof deck. Citizens notes that the changes do not affect the credits available.

Questions people ask

Will a wind mitigation inspection lower my premium?

Insurers may consider the results when rating a policy, but this article cannot promise any discount. The form itself warns that some items may not qualify for a discount, and each insurer applies its own rules. Ask your agent before paying for any retrofit.

Is the inspection the same as a roof inspection?

No. It records specific features for rating and does not evaluate leaks or remaining roof life.

Who should do it?

Any qualified inspector named on the form, which includes licensed home inspectors, building code inspectors, licensed contractors, engineers and architects. Your insurer may recognize others.

How long is it good for?

Up to five years, as long as there are no material changes to the structure and no inaccuracies are found.

Check before you decide

  • Ask for the OIR-B1-1802 (Rev. 04/26) form.
  • Keep permit, NOA, photos and retrofit installation records.
  • Ask your insurer which features it credits before choosing upgrades.
  • If you are replacing the roof, ask your roofer how the deck, underlayment and roof-to-wall work will be documented. See what drives roof replacement cost in Miami-Dade.

Forms and rules change; confirm with your insurer and the OIR.

Sources

  1. Florida OIR - Uniform Mitigation Verification Inspection Form OIR-B1-1802 (Rev. 04/26)
  2. Florida OIR - Wind mitigation resources
  3. Citizens Property Insurance - Uniform Mitigation Verification Inspection form changes (March 19, 2026)
  4. Simpson Strong-Tie - OIR-B1-1802 (Rev. 04/26) overview
  5. Florida Statutes s. 553.844 - Windstorm loss mitigation; requirements for roofs and opening protection
  6. Miami-Dade County - Roof-to-wall connection compliance affidavit