Florida kitchen and bath remodels: permits and contracts

What a Florida kitchen or bath remodel needs: which work requires a permit, which trades are licensed, project stages, and how contracts and change orders work.

By AV Construction Group Corp. Published 7 min read

Illustration for articles about general contracting

Most kitchen and bathroom remodels in Florida need a building permit once they involve electrical, plumbing, mechanical, or structural work. Swapping cabinets or a vanity in the same configuration, and painting, are the kinds of work Miami-Dade lists as exempt. Electrical and plumbing work must be done by contractors licensed in those trades, and the contract with your remodeler should be in writing with the notices Florida law requires.

Does a kitchen or bathroom remodel need a permit?

It depends on what changes. The county's published exemption list for unincorporated Miami-Dade names same-configuration cabinet or vanity replacement and interior painting as work that does not need a building permit. It also lists a combined $5,000 cap in any 12-month period for certain small items on single-family homes, duplexes, townhouses, and condominiums, plus small electrical repairs and switch or outlet replacement under stated limits.

Projects that usually fall outside those exemptions include:

  • Moving or adding plumbing fixtures, supply lines, or drains.
  • New circuits, relocated outlets, or a new range or appliance circuit.
  • Changing mechanical work, such as venting a range hood or bath fan to a new location.
  • Removing or altering walls that are structural, or changing windows and doors.
  • Gas line work.

The county also describes a newer exemption, effective July 1, 2026 under state House Bill 803, for work valued under $7,500 on single-family homes, duplexes, and qualifying townhouses. It never covers electrical, plumbing, structural, mechanical, or gas work, it does not apply in flood hazard areas, and projects cannot be split into pieces to stay under the limit.

Three cautions. The county says its exemption page is for reference and is not complete. Exemptions cover the building permit only; zoning or other approvals can still apply. And cities in Miami-Dade run their own building departments, so confirm with the one that serves your address. If you live in a condominium, also check your association's rules for alterations before you plan anything.

For the step-by-step process, see Miami-Dade building permit basics.

Who must be licensed for each trade?

Florida licenses contractors by category. For a remodel, the usual roles are:

  • General, building, or residential contractor. A general contractor has no limit on the type of work. A building contractor can remodel, repair, or improve a building of any size as long as the work does not affect its structural members. A residential contractor handles one-, two-, or three-family homes within height limits. Any of these can coordinate a kitchen or bath project within their scope.
  • Plumbing contractor. Plumbing systems, including drainage, venting, and water supply, are in the plumbing contractor's scope.
  • Electrical contractor. Installing, repairing, or altering electrical wiring and equipment is electrical contracting.
  • Mechanical and air-conditioning contractors. DBPR lists mechanical and air-conditioning as their own license categories, so ask who will handle any new ventilation or duct work.

Under section 489.113(3), a general, building, or residential contractor must subcontract electrical, mechanical, plumbing, roofing, sheet metal, swimming pool, and air-conditioning work unless the contractor holds a state certificate or registration in that trade. That is normal on a remodel: the lead contractor hires licensed trade subcontractors, and each needs to be permitted properly.

To verify any of these licenses, follow the steps in how to hire a licensed general contractor in Florida. If you are considering acting as your own contractor, state law has specific owner-builder conditions, including onsite supervision and a signed disclosure; they are summarized in the permit basics article.

What the project stages look like

Every remodel is different, and this article does not promise durations. The stages tend to run in this order:

  1. Planning and scope. Decide layout, fixtures, cabinets, countertops, and appliances. Collect product specifications, because they drive both price and lead time.
  2. Estimates and selection. Ask each bidder to price the same written scope so the numbers can be compared. Verify licenses and insurance.
  3. Contract. Review the contract and required notices before signing.
  4. Permit application and plan review. In unincorporated Miami-Dade the county says initial plan review typically takes from 24 hours to 10 business days depending on complexity. Cities set their own timelines.
  5. Ordering and scheduling. Cabinets, special-order tile, and plumbing fixtures can have long lead times; ask suppliers for current dates.
  6. Demolition and rough-in. Walls are opened and plumbing, electrical, and mechanical rough-ins are installed. Inspectors check them before walls are closed.
  7. Close-up and finishes. Drywall, cabinets, tile, counters, and fixtures go in.
  8. Final inspection and closeout. The permit is closed after final inspections are approved. Keep the approvals with your records.

The county notes that a permit gives you 180 days to complete the work, and an approved inspection extends the permit by another 180 days. A Notice of Commencement must be recorded when the work value exceeds $5,000, with an exclusion for HVAC repair or replacement under $15,000.

Contracts, payments, and change orders

Several Florida statutes shape a residential remodeling contract:

  • Lien-law notice. For contracts over $2,500 to improve property with up to four dwelling units, the contract must include a bold, all-capital notice explaining that unpaid workers and suppliers may have claims against your property even if you paid your contractor in full.
  • Down payment timing. If the initial payment exceeds 10 percent of the contract price, the contractor must apply for needed permits within 30 days and start work within 90 days after the permits are issued, unless you agree otherwise in writing or there is just cause.
  • Unlicensed contractors. A contract made by an unlicensed contractor cannot be enforced by that contractor.

Change orders are not defined in the statutes reviewed for this article, so treat them as a matter of contract terms. Good practice is to require that every change be in writing, signed by both parties, and state the changed scope, the price difference, and any effect on the schedule before the extra work begins. Hidden conditions behind walls, such as old pipes or damaged framing, are common reasons for changes; ask how the contract handles them and whether an allowance or contingency is included.

At each payment, ask for lien releases from the contractor and from subcontractors and suppliers who have given notice. The county advises collecting a release of lien and an affidavit confirming that subcontractors and suppliers have been paid before final payment.

How to compare estimates

This article does not quote prices, because costs vary by size, materials, plumbing and electrical changes, building type, and lead time. Instead, compare bids on the same basis:

  • Same layout, same fixtures, same cabinet and countertop specifications.
  • Who is responsible for permits, trade subcontractors, debris removal, and cleanup.
  • Allowances for items you have not chosen yet, and what happens if you exceed them.
  • Payment schedule tied to completed stages, not just dates.

If you want ballpark ranges, look for a recent, dated source that names its year and region, and treat it as a starting point only.

Questions people ask

Can I replace my own vanity or faucet?

Same-configuration cabinet or vanity replacement is on Miami-Dade's exempt list. Changing plumbing connections or moving a fixture is a different matter and generally needs a permit and a licensed plumber.

Who pulls the permit?

Usually the licensed contractor pulls it under their license. Only licensed contractors or owner-builders may obtain a building permit in unincorporated Miami-Dade.

Do I need a permit if I am only changing finishes?

Painting is on the exempt list, but other finish work can touch electrical or plumbing. Ask the building department about your specific scope.

Check before you decide

  • Confirm in writing with the building department whether your scope needs a permit.
  • Verify the license of the contractor and each trade subcontractor.
  • Compare written bids that use the same scope and specifications.
  • Make sure the contract includes the lien-law notice and a clear change-order process.
  • Tie payments to completed stages and collect lien releases.

Rules change, and this article is general information, not legal advice. See remodeling and new construction for the related service overview.

Sources

  1. Miami-Dade County - Permit exemptions
  2. Miami-Dade County - How to apply for a permit
  3. Florida Statutes s. 489.105 - Definitions (contractor categories)
  4. Florida Statutes s. 489.505 - Definitions (electrical contracting)
  5. Florida Statutes chapter 489 - Contracting (includes s. 489.113)
  6. DBPR - Construction Industry Licensing Board (license categories)
  7. Florida Statutes s. 489.126 - Moneys received by contractors
  8. Florida Statutes s. 713.015 - Mandatory provisions in direct contracts
  9. Florida Statutes s. 489.103 - Exemptions